TONGAI
African plateau at dusk with distant power infrastructure

Zimbabwe · Southern Africa · Global AI Infrastructure

Where Energy Becomes Intelligence

Five vertically integrated businesses — Tongai Energy, Grid Co., Connect, Data Centres, and Technology — forming the only shovel-ready, multi-gigawatt AI infrastructure alternative to the Northern Hemisphere.

10GW

Energy

3,175km

Grid Co.

OPGW

Connect

Tier III+

Data Centres

PUE<1.05

Technology

01 · The Five Businesses

One group. Five verticals.

Each colour in Tongai's logo represents a distinct, operating business unit. Together they form a fully vertically integrated AI infrastructure group — from gas molecule to GPU inference, every layer owned and controlled within the group.

Power Generation

Tongai Energy

10GW Muzarabani gas fleet + 4GW solar & BESS. Zimbabwe's AI baseload anchor — dispatchable, no grid dependency.

14GW

Gas + Solar Pipeline

Transmission Network

Tongai Grid Co.

400kV HVAC backbone across 7 segments and 5 countries. OPGW fibre co-deployed on every tower.

3,175km

Regional Grid · 5 Countries

OPGW Fibre · ISP · IAP

Tongai Connect

Licensed ISP and IAP. SEACOM and EASSy submarine backhaul. <120ms EU latency.

400G

Backbone Capacity

Campus Dev & Ops

Tongai Data Centres

Hyperscale and edge campuses. Tier III+ uptime. Leasable stands 10MW → 500MW. 25-year tenure.

500MW

Max Campus Scale

Liquid Cooling · QuadBox

Tongai Technology

Proprietary Thermal Alpha™ DLC. QuadBox compute nodes at 80kW/unit. Net-positive infrastructure.

PUE<1.05

98% Heat Recovery

Explore the platformThe Vertical Stack

From gas molecule to GPU inference, every layer owned within the group.

02 · The Global AI Vault

Why Zimbabwe — why now.

Northern Hemisphere data centres face an existential power crisis. Zimbabwe's untapped resources — delivered through five integrated Tongai businesses — offer the only shovel-ready, multi-gigawatt alternative outside of China.

01

Stranded Energy Assets

Muzarabani holds >140 TCF of gas — Africa's largest undeveloped onshore reserves.

02

Climate Stability

1,200m ASL plateau. No hurricanes. No typhoons. No flooding. 320 days of solar.

03

OPGW Connectivity

SEACOM / EASSy corridor. Tongai Connect OPGW fibre last-mile from every tower.

04

BTG Capital Structure

BTG Consulting Mauritius — recognised for DFI and sovereign wealth participation.

QuadBox liquid-cooled compute node

03 · Tongai Technology

QuadBox — 80kW liquid-cooled compute, anywhere.

A self-contained, IP67-rated compute node delivering four times the density of an air-cooled rack. Direct liquid cooling achieves PUE < 1.05 and recovers 98% of waste heat — turning a cost centre into a circular revenue stream.

80kW

Per unit

<1.05

PUE

98%

Heat recovery

H100/A100

GPU support

04 · The Pipeline

14GW under development.

A multi-phase pipeline spanning gas generation, solar & BESS, and regional transmission — every project power-anchored to the Muzarabani basin.

Phase 1 · Pre-Development

Muzarabani Gas Station Alpha

Mashonaland Central

2,000 MW

capacity

35%

complete

Active · Development

Sunway City Solar Farm

Sunway City, Harare Metro

1,500 MW

capacity

60%

complete

Segment 1 · Active

Muzarabani → Harare Spine

North–South Backbone

480 km

capacity

70%

complete

05 · Leadership

Built by operators.

Executives combining deep Zimbabwe extractive-industry expertise with institutional-grade international experience across energy, technology, and infrastructure finance.

Paul Chimbodze — Chairman

Nhena Nyagura — Group CEO

Martin Schechtner — Group CTO

Culven Chipfumbu — Chief Energy Officer

Harry Samkange — Group COO

Tongai data center campus

Power the next frontier

We are in active discussion with Tier-1 hyperscalers, regional development banks, and sovereign wealth funds. If you seek multi-gigawatt AI infrastructure capacity outside the Northern Hemisphere, we invite a direct conversation.